Limited Time Sale$3.02 cheaper than the new price!!
| Management number | 219079162 | Release Date | 2026/05/03 | List Price | $2.02 | Model Number | 219079162 | ||
|---|---|---|---|---|---|---|---|---|---|
| Category | |||||||||
Sedona collection from Elements is the epitome of ergonomic. This Satin Bronze 1" diameter tapered cylindrical knob makes it easy to grip while providing stylish visual flair. Also available in three pull lengths that feature a pinched concave center. This collection is offered three popular finishes that will add a contemporary feel to your space.. Each item is individually wrapped to protect the item from damage. Attachment hardware is included.
| UPC | 840002559713 |
|---|---|
| Color | Satin Bronze |
| Lock Type | Key Lock |
| Brand Name | Elements |
| Metal Type | Bronze |
| Style Name | Contemporary |
| Unit Count | 1.0 Count |
| Handle Type | Knob |
| Item Weight | 1.92 ounces |
| Finish Types | Satin Bronze |
| Manufacturer | Hardware Resources |
| Model Number | 26SBZ |
| Material Type | Metal |
| Item Type Name | Knobs |
| Exterior Finish | Bronze |
| Handle Material | Alloy Steel |
| Number of Items | 1 |
| Additional Features | Easy to Install |
| Included Components | Knob |
| Projection Distance | 0.94 Inches |
| Manufacturer Part Number | 26SBZ |
| Specific Uses For Product | Cabinets |
| Manufacturer Warranty Description | Limited Lifetime |
If you notice any omissions or errors in the product information on this page, please use the correction request form below.
Correction Request Form